2025

Mise en service complète et début d’exploitation

Jun

Complete commissioning and start of operation

2023

Sep

Oct

Installation of wind turbines at sea

Each wind turbine was towed to its location site by three tugs. Then they were connected to their anchoring system. This was a complex technical stage that required precise coordination between all the partners.

Installation des lignes d’ancrage

Aug

Installation of anchor lines

Assemblage des éoliennes

Jul

Assembly of the 3 wind turbines

The key assemby stages were carried out in the Marseille-Fos port area. The components arrived by ship, then the wind turbines were assembled piece by piece in the following order : the three mast sections, the cradle, and the three blades.

Mai

Juin

Launching of the three floats and towing to the wind turbine assembly site

Arrivée des composants sur le quai Gloria au Port- Saint-Louis-du-Rhône

Apr

Components arriving at the assembly site on the Gloria wharf in Port- Saint-Louis-du-Rhône

Apr

Electrical connection

The electricity generated by Provence Grand Large is transported by an about 30 km connection cable. The electrical connection is buried and therefore completely invisible. The connection route was the subject of two successive consultation phases.

2020

Construction et assemblage des flotteurs

Jan

Construction and assembly of the 3 floats

Each floats is 45 meter high and 80 meter wide. They were designed, developed, and assembled at the Eiffage Metal site in the Marseille-Fos port. Due to their weight, the installation of the transition pieces, which connect the floats and the wind turbines, was a complex operation.

2019

Finalisation du design des flotteurs

Oct

Finalisation of the float design

2016

PGL lauréat de l’appel à projets « Eolfo » de l’ADEME

Oct

Provence Grand Large wins ADEME’s “Eolfo” call for projects

2012

concertation locale

Oct

Start of local consultation